Regarding availabilty during this maintance window, the workload on our canary cluster, with a non high available control-plane, experienced five sessions of 50 seconds downtime on the Kubernetes API endpoint, as was expected. During this time, scheduling of changes within a cluster is postponed. On the same canary cluster the workload did not experience any downtime.